How Long Does a Bathroom Remodel Take? How Long Does a Bathroom Remodel Take?

How Long Does a Bathroom Remodel Take?

When remodeling a bathroom, it is important to understand how long each phase will take. This will help you plan accordingly and prevent any delays or surprises.

Demolition may only take a few days depending on what is being removed, but it can add up if cabinets or a vanity are saved. Also, site protection can prolong demolition.

ASL Remodeling for expert bathroom renovations. Transform your space with quality craftsmanship, innovation and personalized design.

Rough-In

Once the design phase is finished, it’s time to start working on the actual construction. This part of the remodel can take anywhere from a few days to a few weeks.

Getting the right contractor to do the work can make or break your bathroom remodel timeline. Sweeten can help you find vetted contractors, quickly get estimates, and lock in your project dates.

If you’re updating fixtures and flooring, the demolition process can be quick if it’s a small job. But if you’re changing the layout or moving pipes, rough-in will take longer.

This is when the drywall, plumbing and electrical are rerouted to fit your new design. This will take a few days to a week and will be held up by the availability of plumbers, electricians and inspectors.

Drywall

Once the plumbing and electrical rough-in is done, it’s time to add drywall. Drywall is a fast job for professional remodelers but it can take one to two days, depending on the size of your bathroom.

Insulation also goes fairly quickly, but it requires a city inspection which can slow things down. It’s best to plan for delays like this.

It can also take a few weeks to find and hire a contractor, and get city permits and building board approval (if applicable). This is why working with a design-build company like Sweeten can save you so much time!

Plumbing

Once demolition and site protection is complete, the plumbing rough-in phase begins. This involves putting the major framing, plumbing and electrical features in place before the team starts installing new materials.

The rough-in process can take a week or more, depending on the scope of your remodel. It can also be delayed by the availability of materials, especially if you’re using special-order goods like imported tile.

If you’re requiring city permits for your bathroom remodel, expect delays as well. The contractor you hire should help you navigate the permit process, but it can still take time to get approvals and inspections.

Electrical

Once plumbing is complete, the electrician will come in to fit all the electrical fixtures such as vanity lights, switches, fans, robe hooks, towel bars, etc. It usually takes one day for this part of the job.

This is also when the plumber will test the shower pan to make sure it holds water and drains correctly. Then the build team can prefix all the bathroom hardware like toilet paper holders, robe hooks, and hand towel rails.

Depending on the municipality and inspectors, this step could take a few days to several weeks. But, it’s worth the wait when you see your new beautiful bathroom! Also, don’t forget about the waste disposal process for all that demolition and construction debris. It can add a few extra days to the schedule as well.

Finishing

Once the construction team has finished the rough-in phase, it’s time to install and hook up all the fixtures. This includes everything from sinks and tubs to toilets and lighting. This can take a week or more, depending on the scope of the project.

Enhance your home in san jose bathroom remodel with a modern bathroom blending functionality and style for a luxurious and inviting space.

This is also the time to do any plumbing rework and electrical changes that may have been needed as part of your remodel. This takes extra time because the work has to be inspected before your build team can move forward.

It’s important to remember that few bathroom remodels go exactly according to plan. This is especially true if you’re working with multiple contractors who each have their own responsibilities and schedules. This is one of the biggest factors that can cause a remodeling project to run over its projected timeline.